About corner summer house

I dug a gap 400mm deep and positioned Every single put up into it. The post was secured in place using a bag of premixed concrete terrible that just required drinking water incorporating to it and no mixing and sets in just half an hour. I took care to verify each write-up was buried exactly the same depth, vertically stage and sq. with each other.

read more